Powerful cranes with a small footprint, reliable and safe. These are the strengths that have enabled the F65A cranes to better manage the laying operations of a 37 km stretch of pipes in the Modena area. The cranes used for the occasion were set up on crawler machines and used both for handling the pipes and lifting the welding machine that moves along the pipeline. The cranes were also equipped with the Hydraulic Overload Control system which automatically controls the loading conditions of the crane and the lifting moment in relation to the stability conditions of the special vehicle/crane unit.